At the Zotefoams hall we performed:
- The central heating system including a boiler room up to 60 kW for the social and administrative building,
- complete plumbing installation including white assembly, water installation, supply and connection of a rainwater panel,
- A complete system of air conditioning and supply and exhaust ventilation, including the supply of air handling units with a capacity of 260 thousand M3/h and complete automation,
- 100 PSI compressed air system,
- gas installation,
- installation of domestic and process water,
- sanitary and technological installation.
In addition:
- We developed a 3D design of sanitary installations;
- We supplied and installed chillers with a total cooling capacity of 750 kW, along with complete automation and plumbing;