40,000 m³/h - this is the capacity of the Klimor mechanical ventilation system we installed in 2018 for Norma.
Provides ventilation and air conditioning for the production hall.
The basis of the cooling and air conditioning system is a 400 kW Daikin chiller.
For the plant, we designed and implemented cooling, ventilation and air conditioning for the injection molding hall, along with a process water system.