Realizations

Czeladź - Celadia housing estate

The Celadia estate is the latest development proposal under construction in the historically rich Piaski district of Czeladź, on Francuska Street. The development includes four three-story buildings with modern and stylish architecture referring to the history of the district and its current surroundings. The proximity of service establishments and public facilities makes it possible to meet all necessary needs within a kilometer radius. Its own internal green areas create an enclave of peace and provide a respite from the hustle and bustle of the city. From an investment point of view, the area will gain in value in the context of the current development plans of Czeladź. The rooms are spacious, the layout of the apartments is logical, and outside we create a common green space. We are using the best available materials for construction. Within the estate, we have planned to build a covered, green-covered underground parking lot. We will also provide above-ground parking spaces for use. Cheap and modern heat in winter is provided by a heat pump combined with underfloor heating. Pleasant coolness in summer will be obtained by air conditioning. When planning the Celadia estate, we made sure that within a kilometer radius there is everything you could need. Stores and various services, recreational and cultural facilities, public transportation, a school, as well as a park and a playground. The growing problem of limited space for cars is solved by underground parking and above-ground parking spaces. An easy and pleasant commute to work or shopping is provided by the estate's excellent location - 7 minutes to the center of Czeladź, 10 minutes to the center of Sosnowiec and 12 minutes to the center of Katowice.    
Read more

District Park Chorzow

We have launched the District Park Chorzów project.

District Park Chorzów is a response to European trends seeking to decarbonize industry, protect the ozone layer and reduce greenhouse gas emissions. The entire area where the project is being developed is covered by national and European funding programs. Modern technologies and an excellent location are also major assets. - Designed halls in line with the current EU Decarbonization program 2024-2040 - Area of the investment site - 172 231 m² - Commercial area: HALA 1 - 26,300 m² ; HALA H2 - 35,700 m². - The site is covered by the Silesian Province 2021 - 2027 funding program from the Fund for Equitable Transformation - Fixed price guarantee for utilities for 4 years: gas, electricity, heat, refrigeration - Investment start date Q1 2025 - Railroad siding Silesia is one of the best-connected regions in Poland, mainly due to its historically manufacturing and industrial character. Successively expanding road infrastructure over the years, the area boasts the densest network of expressways and highways in the country. Its proximity to the Czech and Slovak borders makes international transportation particularly easy. Geographically, there are as many as 6 major European capitals within a 600 km radius of Katowice: Warsaw, Berlin, Prague, Budapest, Vienna and Bratislava. Moreover, the Euroterminal in nearby Slawkow (broad-gauge railroad) provides direct access to markets in Asia and the Americas. Katowice Airport, on the other hand, is the country's leader in cargo traffic among regional airports. The District Park Chorzów project is therefore located in the very center of the Agglomeration and in the heart of Upper Silesia. Silesia's excellent location also influences the continuous development of the business sector and the emergence of new investment needs. The Ministry of Industry, which is based in Katowice, forecasts further growth in this industrially strong region.
Read more

Implementation of patented system technology for heat and cold extraction and storage

Beneficiary: SMG Silesia Ltd. Project objective: to increase production capacity, introduce a new innovative service and process change through the implementation of an underground system technology for heat and cold extraction and storage. The results of the project will be achieved through the purchase of works and construction materials, machinery and equipment, and systems planned by the project. The investment also includes the concept of obtaining and using electricity from RES in the production process. The implementation of the project will furthermore produce numerous additional effects, including such as:
  • Entering new markets,
  • Improving the quality of work,
  • RES use,
  • Maintaining and creating jobs.
The project leads to minimizing the consumption of raw materials and the volume of waste, reducing emissions and energy loss by creating a closed loop of processes in which waste from one process is used as raw materials for others, thus reducing the global amount of waste as much as possible. Implementation of the project will contribute to mitigating the effects of the transformation of the Silesian province affecting the economy, employment, society and the environment The project will contribute to the development of the infrastructure of the Company SMG ŚLĄSK SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ, among others, by offering services according to designed innovative and environmentally friendly processes. The proposed solution has particularly high potential for cooperation with municipal heating systems, as well as large industrial plants. Source of funding: Fund for Equitable Transformation, European Funds for Silesia 2021-2027 Project value (total project cost): PLN 36,517,000.00 The amount of the European Funds' contribution: PLN 17,110,000.00 #EU funds #European funds
Read more

September - Vida XL

We have performed a number of installations for Vida XL in an area of nearly 120,000 sq. ft:

  • heating
  • gas
  • ventilation
  • 5 gas boiler plants
  • air conditioning
  • plumbing
  • Detection of hydrogen, CO 2 and methane with installation of hydrogen removal from battery charging zones

We connected the automation and control system of the installations.

Construction was completed in October 2021.

Investor: Vida XL

General contractor: Mirbud

Read more

Cold Vodka - MUBEA

In 2022, for the Mubea Automotive Poland Sp. z o.o plant in Zimna Wódka, we made installations:

  • roof drains
  • water and sewage
  • hydrant water
  • Gas for rooftop exchanges and boiler rooms
  • heat for social needs
  • process heat for central
  • ventilation
  • compressed air pipelines

We put the equipment into operation, trained the operators and provided the necessary documentation. We ensure service and smooth operation of our installations.

Main performer: Takenaka

Read more

Radom airport

We have performed a number of installations at the Warsaw-Radom airport:

  • sanitary and process sewers
  • domestic water
  • chilled water
  • central heating
  • process heat
  • Freon air conditioning of technical and electrical rooms
  • mechanical ventilation

We have also developed technologies for the heat substation and chilled water plant.

The implementation was completed in 2022.

General contractor: Mirbud S.A.

Read more

Opole Stadium

The first "green stadium" in Poland - this is what the media called the new stadium in Opole, which we are building together with MIRBUD S.A..

We have already started our work. What are we going to do on this great facility?

We will comprehensively design and install air conditioning and chilled water, as well as mechanical ventilation for the main building. We will also provide ventilation for catering kiosks and sanitary facilities (outside the main building) and ventilation for cash registers.

The stadium in Opole will largely use RES.

On the roof on three sides -  West, east and south - we will install photovoltaic panels with a capacity of about 280 kW. Energy circulation heat pumps and cogeneration units (simultaneous generation of energy and heat) . With these installations we want to make the stadium independent of conventional energy sources. CEO Michal Rosol talked about this in media interviews:

"In the main, we based the solution on heat pumps to provide a constant and uninterrupted supply of heat energy to the facility. On the other hand, during winter periods, we will use cogeneration generators to provide heat supply. In this way, we will make the facility independent of the supply of system heat."

We will also take care of plumbing and hydrant installation and white sanitary installation. We will create drainage for roofs and stands. We will also take care of servicing so that all installations work properly for many years.

General contractor: Mirbud S.A.

Read more

Strzegom - Takenaka

In November 2022, we completed our work on the expansion of an existing industrial bakery. We performed installations on the expanded part:

  • roof drainage,
  • water and sanitary and process sewerage
  • chilled water
  • hydrant
  • CO and process heat
  • gas
  • compressed air
  • ventilation and air conditioning (in the production part, we distributed the ventilation with the help of textile ducts)
  • Dehumidification of air for industrial cold stores and freezers (for the safety of workers and production)

We also installed automation with a control system, expanded the boiler room and engine room. Safety at the facility is ensured by the methane detectors we connected.

Our installations included a production hall, cold storage, freezer, offices, gatehouse and warehouse.

General contractor: Takenaka

Investor: Aryzta

Read more

Skarbimierz - Zotefoams

In 2020, we unloaded and relocated a 102-ton autoclave for Zotefoams Poland in Skarbimierz. We also installed a safety system, a comprehensive STS system and set up an autoclave service platform.

Read more

Zotefoams

At the Zotefoams hall we performed:
  •  The central heating system including a boiler room up to 60 kW for the social and administrative building,
  • complete plumbing installation including white assembly, water installation, supply and connection of a rainwater panel,
  •  A complete system of air conditioning and supply and exhaust ventilation, including the supply of air handling units with a capacity of 260 thousand M3/h and complete automation,
  • 100 PSI compressed air system,
  • gas installation,
  • installation of domestic and process water,
  • sanitary and technological installation.
In addition:
  • We developed a 3D design of sanitary installations;
  • We supplied and installed chillers with a total cooling capacity of 750 kW, along with complete automation and plumbing;
Read more

Standard

40,000 m³/h - this is the capacity of the Klimor mechanical ventilation system we installed in 2018 for Norma.

Provides ventilation and air conditioning for the production hall.

The basis of the cooling and air conditioning system is a 400 kW Daikin chiller.

For the plant, we designed and implemented cooling, ventilation and air conditioning for the injection molding hall, along with a process water system.

Read more

Siemianowice Slaskie - Adient

Heat management, ventilation, chilled water, gas - the paint shop of Adient Seating Poland in Siemianowice Slaskie needed many installations.

Optimal thermal management was particularly important. In 2019-2020:

  • We upgraded the installation  Boiler room - we connected a fourth boiler,
  • We provided heat recovery from the afterburning process,
  • We provided heat transfer from the heat recovery exchanger to the boiler room,
  • We expanded the manifold in boiler room No. 11 to include an additional circuit for hot water preparation in boiler room No. 30 and heat transfer from boiler room No. 11 to boiler room No. 30,
  • We provided heat transfer from boiler room No. 11 to the paint shop.
Read more

Katowice - Tauron Boiler House

In 2015, we completed the reconstruction of a 6MW boiler plant with a 40-meter emitter for Tauron at Studencka Street in Katowice. It meets the requirements for dust, sulfur oxides and nitrogen emissions. We made a freely controllable automation system with external management.

Read more

Dabrowa Gornicza - Saint Gobain

In 2017, we completed a cooling system for the Saint Gobain plant in Dąbrowa Górnicza.

We used existing air handling units, but expanded the systems to include chiller sections, 1 MW Daikin chillers.

We made the pipelines using a grooved connection system.

Read more

Dabrowa Gornicza - Argon Saint Gobain

In 2017, we designed and manufactured the installations needed to weld automotive glass for Argon Saint Gobain in Dąbrowa Górnicza.

100 m3 and an operating pressure of 14 bar - for an autoclave with such parameters we made cooling and coupled air installations.

Read more

Siemianowice Slaskie - Adient

York chillers with a power rating of 2.5 MW, dry liquid coolers, a hydraulic system for the machine room with EPDM seals, and a central chilled water pipeline for metalworking cooling - all this we have done for the Adient plant in Siemianowice Slaskie over the course of 2017-2018.

Read more

Gliwice - Sest Luve

We are betting on renewable energy sources. In 2018, we completed a heating and cooling system for Sest Luve in Gliwice.

We have developed a system based on RES. Among other things, we installed a Viessmann air-to-water heat pump with a total capacity of 1.2 MW and a Viesmann gas boiler plant with a capacity of 3.5 MW. 

We connected our installation to an automatic building control system (Building Management System).

Read more

Elbow - Toyota

In 2018, we completed the expansion of the compressed air system for TNGA engine technology for Toyota. We made the pipelines using the Vic Taulic system.

Read more

Bedzin - Knights Estate

The Rycerskie estate combines the comfort of living with the beauty of nature. Located in an attractive area, the estate offers residents excellent living conditions, in close proximity to green areas and all amenities. The Rycerskie estate consists of 3 apartment buildings with apartments of various sizes, from 42-72 m2 . Each apartment is characterized by modern architecture and functional layout of rooms, as well as high-quality materials that guarantee durability and aesthetics. Residents also have at their disposal recreational areas, including playgrounds, bicycle paths and green spaces for active recreation. An additional advantage of the investment is its location. The estate is located near a developed infrastructure, which provides easy access to stores, schools and public transportation. Residents can enjoy peace and quiet, while having proximity to the bustling city. The Rycerskie estate is an excellent choice for those looking for a modern apartment in a harmonious environment that is conducive to both relaxation and an active lifestyle.
Read more

Dąbrowa Górnicza - La Marina Estate

La Marina estate is distinguished by its unusual location. The project was created with the growing needs of a large agglomeration such as the Katowice region in mind. Located just a few steps from Pogoria IV, one of the most beautiful lakes in the Silesian province, just 20 minutes from Katowice. The design of the estate was created to harmonize with the surrounding nature. The climate of the estate provides harmony of contact with nature, active recreation with the possibility to use the infrastructure of the water sports center and urban life. Excellent communication, as well as proximity to nature, guarantees our customers complete relaxation after a tiring day at work. The houses were made of the highest quality materials. An air heat pump and underfloor heating were used to heat the house. To increase the comfort of use, a recuperation system was established. All installations were made, and the layout of the rooms was designed to maximize its functionality.
Read more
SMG SLĄSK II sp. z o.o. s.k.

2B Barlickiego St., 42-506 Bedzin

+ 48 518 862 067
+ 48 32 775 85 60
biuro@smgslask.pl

District Court Katowice - Wschód in Katowice, VIII Economic Department of the National Court Register

NIP: 646-293-28-76 REGON: 243466291 KRS: 0001115324 Share capital: PLN 200,000
chevron-down
en_USEnglish